首页> 外文期刊>Hydro review >REVIS ITING PMPs
【24h】

REVIS ITING PMPs

机译:修订PMP

获取原文
获取原文并翻译 | 示例
           

摘要

Many dam safety officials use probable maximum precipitation (PMP) for dam safety evaluations and design requirements. But the series of federal publications that provides PMP estimates is rapidly becoming outdated. When should a dam owner consider a new study?rnProbable maximum precipitation, or PMP, has been used as a design basis for many state- and federally-regulated dams since the 1930s. Combined with a rainfall-runoff model for converting precipitation to a streamfiow hydrograph, PMP is used to predict the timing, volume, and peak flow associated with extreme flood events at a dam. Designers obtain PMP values from a patchwork of hydrometeorological reports (HMRs) produced by the U.S. Weather Bureau or its successor, the National Weather Service (NWS), or from site-specific studies performed by private contractors.
机译:许多大坝安全官员将可能的最大降水量(PMP)用于大坝安全评估和设计要求。但是提供PMP估算值的一系列联邦出版物正在迅速过时。自1930年代以来,可能的最大降水量(PMP)被用作许多州和联邦监管的水坝的设计依据。结合降雨径流模型将降水量转换为河流水位图,PMP可用于预测与大坝极端洪水事件相关的时间,流量和峰值流量。设计人员可从美国气象局或其后继国家气象局(NWS)制作的水文气象报告(HMR)拼凑而成的PMP值,或从私人承包商进行的针对特定地点的研究中获得PMP值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号