...
【24h】

Tech Notes

机译:技术说明

获取原文
获取原文并翻译 | 示例

摘要

Snowy Hydro Ltd. has performed a flushing flow trial at Jindabyne Dam designed to better mimic the natural flow characteristics seen in the Snowy Montane rivers. According to the Department of Primary Industries Office of Water in New South Wales, this flow variability technique, known as hydro-scaling, has three objectives: - To better reflect the hydrology of a Snowy Montane river, including increasing the daily, seasonal and annual flow variability; - To provide multiple high-flow events to meet the primary ecological objective of habitat improvement;"and - To fully test the infrastructure capability of Jindabyne Dam to provide variable flow rates.
机译:Snowy Hydro Ltd.已在Jindabyne大坝进行了冲水流量试验,旨在更好地模拟Snowy Montane河中的自然流量特征。根据新南威尔士州第一产业水务局的说法,这种流量可变性技术被称为水垢处理,它具有三个目标:-为了更好地反映斯诺伊蒙塔内河的水文状况,包括增加每日,季节性和年度流量流量可变性; -提供多种高流量事件,以满足改善生境的主要生态目标;”--全面测试金德拜恩大坝提供可变流量的基础设施能力。

著录项

  • 来源
    《Hydro Review Worldwide 》 |2014年第2期| 24-25| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号