...
首页> 外文期刊>Human and ecological risk assessment >Environmental Risk Assessment of Dams in Construction Phase Using a Multi-Criteria Decision-Making (MCDM) Method
【24h】

Environmental Risk Assessment of Dams in Construction Phase Using a Multi-Criteria Decision-Making (MCDM) Method

机译:多标准决策方法在建设阶段大坝环境风险评估中

获取原文
获取原文并翻译 | 示例
           

摘要

This study was conducted to identify environmental and human health risks caused by Balarood Dam, in construction phrase. The first step, all risk-generating factors were identified using a Delphi Questionnaire. Afterwards, the identified criteria were prioritized once using the Analytical Hierarchy Process (AHP) method and then by the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). Due to the complex and uncertain nature of decision-making in times of risk, it was necessary to use more than one weighting method to ensure accuracy of weights. The results from AHP and TOPSIS revealed a mismatch in priorities; therefore, an integration method was presented blending Mean-Rank, Borda, and Copeland methods. According to the TOPSIS results, factors including cut and fill, explosion, and transportation, were first to third highest-priority risk-generating factors, respectively. Considering the results from the AHP method, factors cut and fill, drilling, and explosion were identified as first to third top-priority risk-generating factors, respectively. The results obtained from the integration method suggested that cut and fill, explosion, and drilling are the most important environmental risks at construction phase. As a general conclusion, different weighting methods can lead to different results by which the fate of a decision may be changed and it is essential to control final scores by applying more than one weighting method.
机译:进行这项研究的目的是识别由Balarood大坝造成的环境和人类健康风险。第一步,使用Delphi调查问卷确定所有风险产生因素。之后,使用层次分析法(AHP)方法对确定的标准进行一次优先级排序,然后通过与理想解决方案相似的优先顺序技术(TOPSIS)对其进行优先级排序。由于风险时期决策的复杂性和不确定性,有必要使用一种以上的加权方法来确保权重的准确性。 AHP和TOPSIS的结果显示优先级不匹配;因此,提出了一种将Mean-Rank,Borda和Copeland方法融合在一起的积分方法。根据TOPSIS的结果,包括填挖,爆炸和运输在内的因素分别是优先级最高的风险产生因素,排在第三位。考虑到AHP方法的结果,将切碎,填充,钻探和爆炸等因素分别确定为第一至第三大优先风险产生因素。从集成方法获得的结果表明,挖方,填方,爆炸和钻孔是施工阶段最重要的环境风险。总的来说,不同的加权方法可能会导致不同的结果,通过这些结果可以改变决定的命运,并且通过应用多个加权方法来控制最终分数至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号