Environmental Risk Assessment of Dams by Using Multi-Criteria Decision-Making Methods: A Case Study of the Polrood Dam, Guilan Province, Iran

机译:多准则决策方法对大坝环境风险评估-以伊朗桂兰省波罗德大坝为例

获取原文
获取原文并翻译 | 示例
           

摘要

A dam's construction always imposes some risks to the environment. In this article, the environmental risks of the Polrood dam, located in a northern province of Iran, during its construction phase, were identified, ranked, and evaluated. The risk factors were initially identified by Delphi questionnaire and then rated using the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). Subsequently, the Analytical Hierarchy Process (AHP) was applied to classify the risk factors into four major categories, and Expert Choice software was used to weight them. Based on the obtained results, Physicochemical; Biological; Economic, Social, and Cultural; and Health and Safety risks were rated by the weights of 0.124, 0.080, 0.048, and 0.021, respectively. Among the physicochemicai risks, Erosion and Sedimentation weighted 0.061 and 0.047, respectively, were identified as the most serious risks. Among the biological risks, the highest negative impact was assigned to Land Cover with the weight of 0.189. In the third category, the most important risk was Population Displacement, weighted 0.114. Workers' Falls with the weight of 0.109 was also determined as the highest risk in the last category. A comprehensive risk response plan will be required for dealing with the identified risks and their mitigation.
机译:大坝的建设总是会对环境造成一定的风险。在本文中,对伊朗北部省份Polrood大坝在建设阶段的环境风险进行了识别,排名和评估。风险因素最初是通过Delphi调查表确定的,然后使用“与理想解决方案相似的订单偏好技术”(TOPSIS)进行评估。随后,应用层次分析法(AHP)将危险因素分为四个主要类别,并使用Expert Choice软件对其进行加权。根据获得的结果,理化;生物;经济,社会和文化;和健康与安全风险的权重分别为0.124、0.080、0.048和0.021。在物理化学风险中,侵蚀和沉淀分别为0.061和0.047,被认为是最严重的风险。在生物风险中,对土地覆盖的负面影响最大,权重为0.189。在第三类中,最重要的风险是人口流离失所,权重为0.114。在最后一个类别中,权重为0.109的工人跌倒也被确定为最高风险。将需要制定全面的风险应对计划来应对已识别的风险及其缓解措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号