...
首页> 外文期刊>Heating & Ventilating Review >FAST UPGRADE FOR FAST FOOD SWITCH
【24h】

FAST UPGRADE FOR FAST FOOD SWITCH

机译:快速升级快速食品开关

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

When KFC was looking to transform a Burger King outlet in Banbury, it needed an installer that could match the tight installation timeframe and an air conditioning system that could bring 21 st-century levels of efficiency, comfort and control. Transforming a Burger King fast food outlet into a KFC may sound like a reasonably straightforward task but the recent project in Banbury. Oxfordshire involving Kinlochs and Son Limited (KSL) demonstrated that a restaurant refurbishment often requires more than just a change of menu. Scheduled to take just over seven weeks from start to finish, the KFC franchisee was looking for a swift turnaround on installation. It was clear that the building desperately required a complete overhaul and switching the standard split type air conditioning system to a VRF heat recovery system from Mitsubishi Electric was a starting point.
机译:当肯德基(KFC)打算改造班伯里(Banbury)的汉堡王(Burger King)出口时,它需要一个可以满足紧凑安装时间要求的安装程序,以及一个可以带来21世纪效率,舒适度和控制水平的空调系统。将汉堡王快餐店改成肯德基,这听起来似乎是一个相当简单的任务,但这是班伯里最近的项目。涉及Kinlochs and Son Limited(KSL)的牛津郡证明,餐厅翻新往往不仅需要更改菜单。肯德基(KFC)的加盟商计划从开始到结束只需要七个星期的时间,因此希望尽快进行安装。显然,这座建筑迫切需要彻底检修,将三菱电机的标准分体式空调系统切换为VRF热回收系统是一个出发点。

著录项

  • 来源
    《Heating & Ventilating Review》 |2018年第9期|24-24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号