Project Staff Scheduling with Theory of Coalition

机译:与联盟理论的项目员工调度

获取原文
获取原文并翻译 | 示例
       

摘要

Project scheduling has been still one of the hottest topics in the management area. The goal of traditional project management is to complete the project at the earliest possible time in accordance with the available resources without violating priority relations of the activities involved. Unlike traditional project management, this study deals with the possibility of a coalition among the staff available to accomplish tasks of the project. The tasks can be fulfilled by more than one staff members. Staff's coalition shortens the completion time of the tasks. A natural problem that arises in this case is how to share the income generated. The other side of the problem is concerned with the project owner who wants the project to be completed as early as possible. In this study, a mathematical model proposal is dealt with in order to realize the goals of both the project owner and the staffs as much as possible within the complex structure of the situation.
机译:项目调度仍然是管理区中最热门的主题之一。传统项目管理的目标是尽可能应尽早按照现有资源完成项目,而不违反所涉及的活动的优先关系。与传统项目管理不同,这项研究涉及可用于完成项目任务的工作人员之间的联盟的可能性。任务可以由一个以上的工作人员满足。员工的联盟缩短了任务的完成时间。在这种情况下出现的自然问题是如何分享所产生的收入。问题的另一面涉及希望尽早完成项目的项目所有者。在这项研究中,处理了一个数学模型提案,以便在局势的复杂结构中尽可能地实现项目所有者和工作人员的目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号