首页> 外文期刊>Geotechnical testing journal >Development and Application of a Test System for Modeling Tunnel Excavation with Transparent Rock Surrogate
【24h】

Development and Application of a Test System for Modeling Tunnel Excavation with Transparent Rock Surrogate

机译:透明岩体模拟隧道开挖试验系统的开发与应用

获取原文
获取原文并翻译 | 示例

摘要

Physical modeling using transparent rock or soil surrogates and optical measurement is an effective way to obtaining the displacement and stresses within test specimens in geotechnical engineering. To apply the prospective modeling method to investigating the mechanism of excavation-induced failure of rock surrounding tunnels, a novel test system is developed for modeling tunnel excavation with transparent rock surrogate. The system includes three parts: one transparent acrylic chamber and its reinforcing units for containing scaled models, a dead-weight loading device consisting of levers and pulleys, and a three-dimension optical stressometer made of polyurethane block and fiber Bragg gratings. The test system is then employed to visualize the excavation of a round tunnel and some favorable results are gained. To some extent, the work in this article improves the physical modeling techniques and provides an effective method for the modeling research in rock tunnel engineering.
机译:在岩土工程中,使用透明岩石或土壤替代物以及光学测量进行物理建模是获得试样中位移和应力的有效方法。为了将前瞻性建模方法用于研究围岩隧道开挖引起的破坏机理,开发了一种新型的测试系统,用于对具有透明岩石替代物的隧道开挖进行建模。该系统包括三个部分:一个透明的丙烯酸室及其用于容纳比例模型的增强单元,一个由杠杆和滑轮组成的自重加载装置以及一个由聚氨酯块和光纤布拉格光栅制成的三维光学应力计。然后,将测试系统用于可视化圆形隧道的开挖并获得一些良好的结果。本文的工作在一定程度上改进了物理建模技术,为岩洞工程的建模研究提供了有效的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号