首页> 外文期刊>Geotechnical and geological engineering >Evaluation of superficial settlements in low overburden tunnel TBM excavation: Numerical approaches
【24h】

Evaluation of superficial settlements in low overburden tunnel TBM excavation: Numerical approaches

机译:低覆岩隧道TBM开挖中浅层沉降的评估:数值方法

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper the problem of the superficial settlements related to tunnel mechanised excavation is analysed considering a low overburden application example. The excavation of tunnels in urban areas has actually important diffusion. This kind of work always implies to guarantee the safety and the stability of the existing superficial structures. The use of a tunnel boring machine (TBM) represents a good method in these conditions and the estimation of the induced settlement represents a difficult engineering problem. The study shows the differences between three different numerical approaches; the results, function of the same loss of volume, evidence from a quantitative point of view, the ground settlement.
机译:本文在考虑低覆盖层应用实例的基础上,分析了与隧道机械化开挖有关的浅层沉降问题。城市地区的隧道开挖实际上具有重要的扩散作用。这种工作总是意味着要保证现有浅层结构的安全性和稳定性。在这种情况下,使用隧道掘进机(TBM)代表了一种好的方法,而对诱发沉降的估算则代表了一个困难的工程问题。研究显示了三种不同数值方法之间的差异。结果,功能损失量不变,证据从定量的角度考虑,地面沉降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号