Optimized scheduling method for office building renovation projects

机译:办公楼装修项目的优化调度方法

获取原文
获取原文并翻译 | 示例
           

摘要

Office building renovation works allow for dynamic schedule planning, which breaks traditional logical relationships among construction work tasks. Consequently, the duration of renovation projects can be shortened significantly through dynamic scheduling. However, there are limited studies addressing this aspect. Therefore, in this study, we developed a scheduling method for office building renovation projects enabling the creation of schedule alternatives and suggesting optimized schedules in terms of project duration and cost efficiency. The developed method was applied to an actual renovation project, and the following results were obtained: (i) The method could develop six schedule alternatives reflecting project conditions and improve their cost and duration performance by 14.83% to 23.17% through optimization. (ii) Specifically, the sixth and fourth alternatives could yield a 36.18% lower project duration and 63.54% higher cost performance, respectively, compared to the other alternatives. Using this optimized scheduling method, project owners and managers can successfully plan their renovation projects while satisfying the requirements in terms of the project duration and cost.
机译:办公楼装修工程允许动态的时间表规划,这在施工工作任务中断了传统的逻辑关系。因此,通过动态调度可以显着缩短装修项目的持续时间。然而,有有限的研究解决了这方面。因此,在本研究中,我们开发了一个办公楼改造项目的调度方法,从而在项目持续时间和成本效率方面创建了进度替代方案和建议优化的时间表。将开发的方法应用于实际的改造项目,获得以下结果:(i)该方法可以通过优化开发反映项目条件的六个方案替代品,并通过优化将其成本和持续时间表现提高14.83%至23.17%。 (ii)具体地,与其他替代方案相比,第六和第四次替代方案分别可以产生36.18%的项目持续时间和更高的成本性能更高的63.54%。使用此优化的调度方法,项目所有者和管理人员可以成功计划其改造项目,同时满足项目持续时间和成本的要求。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号