首页> 外文期刊>Evaluation and program planning >Revisiting the utility of retrospective pre-post designs: The need for mixed- method pilot data
【24h】

Revisiting the utility of retrospective pre-post designs: The need for mixed- method pilot data

机译:回顾追溯式事前设计的实用性:对混合方法试验数据的需求

获取原文
获取原文并翻译 | 示例

摘要

The retrospective pre-post design affords many benefits to program staff and, accordingly, has piqued renewed interest among applied program evaluators. In particular, the field has witnessed increasing application of a post-program-only data collection strategy in which only posttest and retrospective pretest data are collected. A post-program-only assessment strategy takes considerably less time than is required for collecting pre-program data and presumably has the added benefit of eliminating the impact of response-shift bias. Response-shift bias occurs when the knowledge, skills, or experiences participants gain through program participation leads them to interpret questionnaire items in a qualitatively different manner at pretest versus posttest. In this article, we discuss the strengths and weaknesses associated with administering retrospective pretest assessments and underscore the importance of thoroughly evaluating any application of a retrospective measurement strategy prior to its broader implementation. We provide a practical illustration of this evaluation process using a mixed-method study that assesses one measure of parenting education program effectiveness-the Parenting Skills Ladder.
机译:追溯式岗前设计为计划人员带来了很多好处,因此引起了应用计划评估人员的重新关注。特别地,该领域见证了仅程序后数据收集策略的日益广泛的应用,其中仅收集后测试和回顾性预测试数据。仅程序后的评估策略所花费的时间比收集程序前数据所需的时间要少得多,并且大概具有消除响应偏移偏见的额外好处。当参与者通过计划参与获得的知识,技能或经验导致他们在测试前和测试后以质的不同方式解释调查表项目时,就会发生反应转移偏见。在本文中,我们讨论了与进行回顾性预测试评估有关的优缺点,并强调了在更广泛地实施之前,必须全面评估回顾性测量策略的任何应用的重要性。我们使用一项混合方法研究来评估评估过程的实用例证,该研究评估了一项育儿教育计划有效性的衡量标准-育儿技能阶梯。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号