首页> 外文期刊>Environmental Law and Management >Strategic Issues - Scotland
【24h】

Strategic Issues - Scotland

机译:战略问题-苏格兰

获取原文
获取原文并翻译 | 示例
           

摘要

The EU has a new directive on Environmental Impact Assessment (EIA), Directive 2014/52/EU, and the Scottish Government is consulting on its transposition. For now, at least, and on the face of it, it is business as usual for transposition. Although there is general provision for EIA, usually within the planning system (SSI 2011 /139) there are also several special EIA regimes in operation in Scotland - the picture is quite complex and the document reflects that complexity. It also shows signs of having been written in a hurry - it is probably inevitable that as Brexit weighs heavily on the minds and work programmes of all elements of government, other tasks will be correspondingly squeezed.The main part of the document, however, is easy to follow, with each amended Article set out, then a brief description of the change and then how it will be implemented. The draft amending regulations are in separate documents, so following through to the detail of the actual proposal does need those as well. The draft Regulations currently available are the 'main' regulations (Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017) and separate provision for electricity works; these and other documents are available from the consultation pages.This consultation proposes changes to eight separate regimes, whilst Ports and Harbours, Flooding and Controlled Activities will follow separately. Most of them have separate regulations, which will have to be amended. One does wonder if a main set with special regimes included in specific parts might be cleaner and easier to use.
机译:欧盟针对环境影响评估(EIA)制定了新指令,即2014/52 / EU指令,苏格兰政府正在就其转换方式进行咨询。至少就目前而言,从表面上看,换位是照常进行的。尽管对环境影响评估有一般规定,但通常在规划系统内(SSI 2011/139),苏格兰也有几种特殊的环境影响评估制度正在运作中-情况相当复杂,文件反映了这种复杂性。它也显示出匆忙编写的迹象-由于英国退欧在政府各部门的思想和工作计划上占了很大比重,因此不可避免地会压缩其他任务。文件的主要部分是易于遵循,列出了每条经修订的条款,然后简要描述更改以及更改的实施方式。修订规章草案在单独的文件中,因此按照实际提案的细节进行操作确实也需要这些文件。目前可用的法规草案是“主要”法规(《 2017年城镇与国家规划(环境影响评估)(苏格兰)法规》)和电力工程的单独规定;这些和其他文件可从咨询页面中获得。该咨询建议对八个单独的制度进行更改,而港口和港口,洪水和控制活动将分别进行。他们中的大多数都有单独的规定,需要对其进行修订。有人确实想知道,包含在特定部分中的具有特殊机制的主机集是否更干净,更易于使用。

著录项

  • 来源
    《Environmental Law and Management》 |2016年第2期|98-101|共4页
  • 作者

    Sarah Hendry;

  • 作者单位

    Centre for Water Law, Policy and Science, University of Dundee;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号