【24h】

Case Law

机译:判例法

获取原文
获取原文并翻译 | 示例
           

摘要

The case involved a challenge by the applicant company (Holcim) against a decision of the General Court (Case T-317/12, EU:T:2014:782). Holcim is a trans-national company which manufactures a variety of construction-based products including cement, aggregates, asphalt and ready-mixed concrete.The context of the case is set in the UN Framework Convention on Climate Change (UNFCCC) and its implementing measures, which were essentially concerned with emissions trading established under a number of EU law provisions. Holcim's Romanian subsidiary had emission allowance accounts registered at the Romanian registry. In November 2010, one million allowances belonging to it were allegedly unlawfully transferred to an account in Italy and 600,000 allowances transferred to Liechtenstein.The stolen allowances - which at the time of the action before the General Court had not been recovered - were valued by Holcim in the region of €15 million.
机译:该案涉及申请人公司(Holcim)对普通法院的裁决提出异议(案例T-317 / 12,EU:T:2014:782)。 Holcim是一家跨国公司,生产各种建筑产品,包括水泥,集料,沥青和预拌混凝土,具体情况由《联合国气候变化框架公约》(UNFCCC)及其实施措施确定,这实际上与根据许多欧盟法律规定建立的排放交易有关。 Holcim的罗马尼亚子公司在罗马尼亚注册处注册了排放配额帐户。据称,2010年11月,属于该组织的100万欧元配额被非法转移到意大利的一个账户中,有600,000美元的配额被非法转移到列支敦士登.Holcim评估了被盗的配额-在总法院提起诉讼时尚未追回。在1500万欧元左右。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号