...
首页> 外文期刊>Environment reporter >Florida Pipeline's Legal Battles Persist After Construction
【24h】

Florida Pipeline's Legal Battles Persist After Construction

机译:佛罗里达管道的法律斗争在建设后仍然存在

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The owners of almost 700 miles of new pipeline into Florida aim to start the flow of natural gas in June-if federal regulators give the go-ahead despite objections and lawsuits from the Sierra Club and others. Construction is finished and testing is underway on a trio of connected pipelines dubbed the Southeast Market Pipelines Project. Despite the pipelines already being built, the Sierra Club and other organizations have asked the Federal Energy Regulatory Commission to postpone letting them go into service until an updated environmental analysis is completed and related federal litigation is resolved.
机译:尽管塞拉俱乐部和其他组织提出反对和诉讼,但如果联邦监管机构批准,进入佛罗里达的将近700英里的新管道所有者的目标是在6月开始天然气输送。三个被称为“东南市场管道项目”的连通管道的建设已经完成,测试正在进行中。尽管已经在建设管道,但Sierra Club和其他组织已要求联邦能源管理委员会推迟让它们投入使用,直到完成最新的环境分析并解决相关的联邦诉讼为止。

著录项

  • 来源
    《Environment reporter》 |2017年第22期|1038-1038|共1页
  • 作者

    Chris Marr;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号