Legal Battles Over Pipelines Deluge U.S. Legal System With Questions Of Authority

机译:法律战斗在管道上删除美国法律制度,具有权威问题

获取原文
获取原文并翻译 | 示例
           

摘要

We are in the midst of a flood! Not literally, but there are overwhelming legal and regulatory issues involving water and industry: the scope of Section 401 permits allowing for pipeline stream crossings, the use of Nationwide Permit 12, and the legal challenges to the Navigable Waters Protection Rule (NWPR), defining the scope of Waters of the United States. Pipeline permitting requires companies to obtain water crossing permits from affected states. Some states, notably New York and Washington, used the permits, granted under Section 401 of the Clean Water Act, as a tool to block fossil fuel infrastructure development. New York's refusal to grant a 401 permit to Constitution Pipeline resulted in the project's demise after an eight-year battle. As part of its efforts to promote American energy development, the Trump administration issued Executive Order 13868 in April 2019, which directs the U.S. Environmental Protection Agency to review Section 401 and EPA's related regulations and guidance to determine whether the agency's policies should be updated or clarified. In response, EPA announced a final rule on June 1, 2020. EPA Administrator Andrew Wheeler stated, "EPA is returning the (CWA) certification process under Section 401 to its original purpose, which is to review potential impacts that discharges from federally permitted projects may have on water resources, not to indefinitely delay or block critically important infrastructure."
机译:我们在洪水中!没有字面上,但有压倒性的法律和监管问题涉及水和行业:第401节的范围允许管道流过境,使用全国许可证12,以及通航水域保护规则(NWPR)的法律挑战,定义美国水域的范围。管道允许公司从受影响国家获得水交叉许可证。一些州,特别是纽约和华盛顿,利用了在清洁水法第401条下授予的许可证,作为阻止化石燃料基础设施发展的工具。纽约拒绝向宪法管道授予401份允许,导致该项目在八年战斗后的消亡。作为促进美国能源发展的努力的一部分,特朗普管理局于2019年4月发布了执行令13868,指导美国环境保护局审查401和环保署的相关法规和指导,以确定原子能机构是否应更新或澄清。作为回应,EPA于6月1日宣布了2020年6月1日的最终规则。EPA管理员Andrew Wheeler规定,“EPA正在将第401节返回到其原始目的,这是审查从联邦允许的项目中排出的潜在影响可能有水资源,而不是无限期地延迟或阻止批判性重要的基础设施。“

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号