Landmark NSR Ruling May Further Stymie EPA's Enforcement Efforts

机译:具有里程碑意义的NSR裁决可能会进一步阻碍EPA的执法工作

获取原文
获取原文并翻译 | 示例

摘要

A federal court in Pennsylvania has dismissed EPA new source review (NSR) enforcement efforts to obtain penalties from a Pennsylvania power plant, holding that the agency could not hold the plant's new owners liable for violations of the agency's clean air permit rules by the plant's prior owners - a ruling that could further curtail EPA's enforcement efforts. In an Oct. 12 ruling in United States of America v. EME Homer City Generation LP, et ai, Judge Terrence McVerry of the U.S. District Court for the Western District of Pennsylvania granted the company's motion to dismiss the enforcement action after finding that EME could not be held responsible for any alleged violations of the NSR/Prevention of Significant Deterioration (PSD) rules committed by the prior owner and that a five-year statute of limitations on any of those claims had already elapsed. The ruling is available on InsideEPA.com. See page 2 for details. {Doc ID: 2379151) "The alleged PSD violations constitute singular, separate failures by the former owners to obtain pre-construction permits, rather than ongoing failures to comply with whatever hypothetical conditions might have been imposed during the PSD permitting process. Thus, the United States was required to file suit to recover civil penalties for an alleged PSD program violation within five years of the construction project," the ruling says. The judge also found that the government was barred by the general five-year statute of limitations from seeking to win injunctive relief, which is also a finding that could have significant precedent. EME Homer City is the same company leading the legal challenge to EPA's Cross State Air Pollution Rule (CSAPR) and is one of the nation's largest emitters of sulfur dioxide (SO2). The NSR case focused on projects dating from 1990 that boosted SO2.
机译:宾夕法尼亚州的一家联邦法院已驳回了EPA新源审查(NSR)的执法工作,以从宾夕法尼亚州的一家发电厂处以罚款,理由是该机构不能追究该工厂的新所有人因工厂先前违反该机构的清洁空气许可证规则而承担的责任。业主-该裁决可能会进一步限制EPA的执法力度。在10月12日的美国诉EME Homer City Generation LP等案中,宾夕法尼亚州西区美国地方法院的Terrence McVerry法官在认定EME可以对于先前拥有者所犯的任何违反NSR /防止严重恶化(PSD)规则的指控,以及对这些索赔中的任何一项索赔的时效期限已过去五年的行为,均不承担责任。该裁定可在InsideEPA.com上找到。有关详细信息,请参见第2页。 {Doc ID:2379151)“被指控违反PSD的行为是前所有人未获得施工前许可证的唯一,单独的失败,而不是持续不断地不遵守PSD许可过程中可能施加的任何假设条件。因此,该裁决要求美国提起诉讼,要求在建设项目的五年内,就涉嫌违反PSD程序的行为追讨民事罚款。”法官还发现,政府受到一般性的五年时效条例的限制,不能寻求获得禁令救济,这也是一个可能具有重大先例的裁定。 EME荷马市与美国环保署(EPA)跨州空气污染规定(CSAPR)一起面临法律诉讼,是美国最大的二氧化硫(SO2)排放国之一。 NSR案的重点是1990年以来增加SO2的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号