首页> 外文期刊>Engineers Australia >Feedback sought for proposed South Australian mine
【24h】

Feedback sought for proposed South Australian mine

机译:为拟建的南澳大利亚矿寻求反馈

获取原文
获取原文并翻译 | 示例
       

摘要

After almost five years of preparation, BHP Billiton has released the draft environmental impact statement (EIS) for the proposed expansion of its mining operations at Olympic Dam in northern South Australia. The EIS, prepared by Arup and ENSR Australia (now AECOM), will be on public display until 7 August, during which time submissions can be made about the proposed expansion. The company will then collate the submissions and produce a supplementary EIS responding to the issues raised.
机译:经过近五年的准备,必和必拓发布了环境影响报告书草案(EIS),以提议扩大其在南澳大利亚州北部奥林匹克大坝的采矿业务。由Arup和ENSR Australia(现为AECOM)准备的EIS将会公开展示,直到8月7日,在此期间可以就拟议的扩展提交意见。然后,公司将整理意见书,并针对提出的问题生成补充的EIS。

著录项

  • 来源
    《Engineers Australia》 |2009年第5期|24-24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号