...
首页> 外文期刊>Engineers Australia >ENVIRONMENTAL ENGINEERING EXCELLENCE AWARD
【24h】

ENVIRONMENTAL ENGINEERING EXCELLENCE AWARD

机译:环境工程卓越奖

获取原文
获取原文并翻译 | 示例
           

摘要

The Hattah Lakes Environmental Infrastructure Project is one of Australia's largest environmental works projects. It is also the first of its kind to build permanent large scale water management infrastructure solely for environmental purposes in the country. The 20 semipermanent lakes form part of the 48,000 ha Hattah-Kulkyne National Park in Victoria. They are connected to the Murray River via Chalka Creek but now naturally fill less often and for shorter periods due to river regulation and a changing climate. The project restored a more natural flooding pattern to Hattah Lakes through works including the installation of a smart pump station capable of discharging up to 1000 ML/d.
机译:哈达湖环境基础设施项目是澳大利亚最大的环境工程项目之一。它也是同类中第一个仅用于该国环境目的的永久性大型水管理基础设施建设。这20个半永久性湖泊构成了维多利亚州占地48,000公顷的Hattah-Kulkyne国家公园的一部分。它们通过查尔卡河(Chalka Creek)连接到墨累河(Murray River),但由于河流管制和气候变化,自然而然地减少了填充频率,并缩短了填充时间。该项目通过包括安装智能泵站的工作,使哈达湖恢复了更自然的洪水格局,该泵站的排污能力高达1000 ML / d。

著录项

  • 来源
    《Engineers Australia》 |2014年第12期|44-44|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号