首页> 外文期刊>Engineers Australia >RET review fears realised
【24h】

RET review fears realised

机译:RET复习恐惧感

获取原文
获取原文并翻译 | 示例
       

摘要

The long awaited report into the controversial review of the Renewable Energy Target (RET) has been handed to the federal government, with recommendations to scale back the target confirming the fears held by renewable energy companies and investors. The panel, chaired by businessman and climate sceptic Dick Warburton, handed down two recommendations for both the large scale RET (LRET) and the small scale renewable energy scheme (SRES). Labelling the RET a "high cost approach to reducing emissions" it recommended that the LRET be scaled back and closed to new investment but allowed to continue until 2030 for existing and committed renewable generators. As an alternative, it recommended that the LRET could be modified to increase in proportion with growth in electricity demand, by setting targets one year in advance that correspond to a 50% share of new growth.
机译:备受争议的可再生能源目标(RET)审查报告已提交给联邦政府,并提出了缩减目标的建议,从而确认了可再生能源公司和投资者的担忧。由商人和气候怀疑论者迪克·沃伯顿(Dick Warburton)主持的小组就大型可再生能源(LRET)和小型可再生能源计划(SRES)提出了两项​​建议。建议将可再生能源技术标记为“减少排放的高成本方法”,建议缩小可再生能源技术的规模并禁止新的投资,但允许现有和已承诺的可再生能源发电机继续使用到2030年。作为替代方案,它建议可以通过提前一年设定对应于新增长的50%的目标,对LRET进行修改以随电力需求的增长而增加。

著录项

  • 来源
    《Engineers Australia》 |2014年第9期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号