Dynamic responses of bridge-embankment transitions in high speed railway: Field tests and data analyses

机译:高速铁路桥梁-路堤过渡的动力响应:现场试验和数据分析

获取原文
获取原文并翻译 | 示例

摘要

By virtue of its high speed, steadiness, and quality experience, high speed railway (HSR) has grown rapidly. During that development, problems such as dynamic irregularity in the bridge-embankment transition have been exposed and have aroused keen attention. To study dynamic performance in bridge-embankment transition, field dynamic tests under 120 high speed vehicles running at speeds of 5-360 km/h were carried out. Then, processed signals were obtained from the original signals by a series of signal processing methods such as wavelet soft threshold filtering, Newton-Cortege integration, and five-thirds smoothing. Moreover, the statistical test data were analyzed in the time/frequency domain to obtain the frequency characteristics, the rules governing changes in dynamic responses along the longitudinal and depth directions, and the rules governing changes in dynamic responses with train speed, train running direction, vehicle axle load, and adjacent load. The results showed that (i) the concentration range of the first two main frequency was generally 0-50 Hz, (ii) particular attention should be paid to sections 7.5 m, 13 m and 25 m from the abutment tail, and (iii) importance should be attached to the bed surface layer. As well, 275 km/h was the critical train speed and acceleration was a sensitive dynamic index. Finally, the dynamic responses showed that a bridge-embankment transition with the subgrade filled with graded gravel + 5% cement satisfied design and operation requirements at speeds of 5-360 km/h.
机译:凭借其高速,稳定和高质量的经验,高速铁路(HSR)迅速发展。在这一发展过程中,诸如桥梁-路堤过渡动态不规则之类的问题已经暴露出来并引起了人们的高度关注。为了研究桥堤过渡中的动力性能,在120辆以5-360 km / h的速度行驶的高速车辆下进行了现场动力测试。然后,通过一系列信号处理方法(例如小波软阈值滤波,Newton-Cortege积分和五分之三的平滑处理)从原始信号中获得处理后的信号。此外,在时/频域中分析统计测试数据以获得频率特性,控制沿纵向和深度方向的动态响应变化的规则以及控制动态响应随列车速度,列车运行方向,车轴负载和邻近负载。结果表明:(i)前两个主频率的浓度范围通常为0-50 Hz,(ii)应特别注意距基台尾部7.5 m,13 m和25 m的区域,以及(iii)床表面层应具有重要意义。同样,275 km / h是关键的火车速度,加速度是敏感的动态指标。最终,动力响应表明,路基中填充有分级砾石+ 5%水泥的桥梁-路堤过渡在5-360 km / h的速度下可以满足设计和运行要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号