首页> 外文期刊>Engineering news-record >BOSTON CENTRAL ARTERY PROJECT PLUGGING COSTLY TUNNEL LEAK
【24h】

BOSTON CENTRAL ARTERY PROJECT PLUGGING COSTLY TUNNEL LEAK

机译:波士顿中央动脉项目堵塞成本高的隧道泄漏

获取原文
获取原文并翻译 | 示例
       

摘要

With billions worth of construc-tion already in place, officials at Boston's $14.5-billion Central Artery/Tunnel project are now struggling to tame an irritating 80-ft-wide, water-filled gap at the critical $l-billion Fort Point Channel crossing. The triangle-shaped gap, which occupies half of a future cut-and-cover tunnel now split by a giant berm, is holding up the mating of numerous jacked, cut-and-cover and immersed tube tunnels. The situation is now delaying completion of Interstate 90 by four months.
机译:由于已经进行了数十亿美元的建设,波士顿耗资145亿美元的中央动脉/隧道项目的官员现在正努力在至关重要的价值10亿美元的Fort Point海峡通道处解决一个令人烦恼的80英尺宽,充满水的缺口。三角形的缝隙占据了未来一条巨大的护堤所分割的可开挖隧道的一半,它阻止了许多顶管,可开挖和沉管隧道的交配。现在的局势将90号州际公路的竣工推迟了四个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号