首页> 外文期刊>Engineering news-record >Planned, Collapsed Terminals Featured at Peer Review
【24h】

Planned, Collapsed Terminals Featured at Peer Review

机译:在同行评审中精选的计划中的,坍塌的码头

获取原文
获取原文并翻译 | 示例
       

摘要

Missing reinforcing bar may have contributed to the May 23 collapse of a 30-m section of a new Paris airport concourse, a French official told airport professionals earlier this month in Buffalo. The 17-year-old peer review process gained an international flair as participants discussed evolving airport security developments, runway paving, new terminal construction and other issues. Marc Noyelle, executive director and chief development officer for Aeroports de Paris, briefed the group of about 30 U.S. and Canadian airport officials on the status of the Charles de Gaulle Airport concourse. The steel-ten-sioned arched concrete structure's collapsed portion supported three pedestrian bridges connecting the main building and concourse to a boarding area. Investigations and clean-up continue, Noyelle said.
机译:法国官员本月早些时候在布法罗告诉机场专业人士,缺少钢筋可能是导致5月23日新的巴黎机场大厅30米断面坍塌的原因。参加者讨论了不断发展的机场安全发展,跑道铺设,新航站楼建设等问题,这一具有17年历史的同行评审过程赢得了国际关注。巴黎机场的执行董事兼首席发展官马克·诺耶尔(Marc Noyelle)向工作组约30名美国和加拿大机场官员介绍了戴高乐机场大厅的状况。钢制张紧的拱形混凝土结构的塌陷部分支撑着三座人行天桥,这些人行天桥将主楼和大厅连接到登机区。诺伊尔说,调查和清理工作仍在继续。

著录项

  • 来源
    《Engineering news-record》 |2004年第12期|p.16|共1页
  • 作者

    Aileen Cho;

  • 作者单位

    Buffalo;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:17:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号