首页> 外文期刊>Engineering news-record >Modified Waters Plan Awaits Public Comments To Advance
【24h】

Modified Waters Plan Awaits Public Comments To Advance

机译:修改后的沃特世计划正在等待公众意见的提出

获取原文
获取原文并翻译 | 示例
           

摘要

Public comments are due on May 9 on the U.S. Army Corps of Engineers' "tentatively selected plan" (TSP) to address one of the longest-standing congressional mandates for restoration of the Everglades. The TSP is a key component of Modified Waters Delivery included in the 1989 legisla-tion that expanded Everglades National Park to include the northeast Shark River Slough, the park's principal water supply. The purpose of "Mod Waters" is to restore the sheetflow of water that sustained the Everglades for thousands of years before being disrupted by attempts to "reclaim" the land for agriculture. Now, the Corps hopes to begin construction by October.
机译:定于5月9日对美国陆军工程兵团的“临时选拔计划”(TSP)发表公开评论,以解决国会对修复大沼泽地的最长期任务之一。 TSP是1989年立法中修改水源输送的关键组成部分,该立法将大沼泽国家公园扩大到包括东北主要公园的鲨鱼河泥沼。 “ Mod Waters”的目的是恢复承受大沼泽地数千年的水流,然后才被试图“开垦”农业用地所破坏。现在,该军团希望在10月份开始建设。

著录项

  • 来源
    《Engineering news-record》 |2008年第16期|p.12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号