首页> 外文期刊>Engineering news-record >Impregilo Faces Challenge Of 3-Mile-Long Tunnel Under Lake Mead, Las Vegas
【24h】

Impregilo Faces Challenge Of 3-Mile-Long Tunnel Under Lake Mead, Las Vegas

机译:Impregilo面临拉斯维加斯米德湖下3英里长隧道的挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Impregilo and S.A. Healy Co., a wholly owned subsidiary of Impregilo, in a joint venture known as Vegas Tunnel Constructors, were awarded the Lake Mead Intake No. 3 Tunnel Project by the Southern Nevada Water Authority (SNWA) in March 2008. The contract value is US$ 447 million, and the contract type is design-build. Project completion is slated for 2014. The project consists of a 3-mile-long tunnel under Lake Mead, in Las Vegas, ending at a new intake structure that will be over 350 feet below the high-water line, to ensure the reliability of the southern Nevada water supply system. There are three main project areas, two of which will utilize first-of-its-kind technology.
机译:Impregilo和Impregilo的全资子公司SA Healy Co.合资成立了Vegas隧道建设商,并于2008年3月被南内华达州水务局(SNWA)授予米德湖入水口3号隧道项目。合同合同金额为4.47亿美元,合同类型为设计建造。该项目计划于2014年完成。该项目包括一个3英里长的隧道,该隧道位于拉斯维加斯的米德湖下方,终点为一个新的取水口结构,该结构将比高水位线高350英尺,以确保内华达州南部的供水系统。有三个主要的项目领域,其中两个将利用首创技术。

著录项

  • 来源
    《Engineering news-record》 |2011年第13期|p.a15|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号