首页> 外文会议>Rapid Excavation and Tunneling Conference(2007 RETC); 2007; Toronto(CA) >THE LAKE MEAD INTAKE 3 WATER TUNNEL AND PUMPING STATION, LAS VEGAS, NEVADA, USA
【24h】

THE LAKE MEAD INTAKE 3 WATER TUNNEL AND PUMPING STATION, LAS VEGAS, NEVADA, USA

机译:迈德湖3水隧道和抽水站,拉斯维加斯,美国内华达州

获取原文
获取原文并翻译 | 示例

摘要

The Southern Nevada Water Authority (SNWA) operates two water-intakes in Lake Mead, located 20 miles east of Las Vegas, Nevada. Severe drought has caused decline in lake level by 85 feet since 2000 and future declines are expected. SNWA will construct a third deep-water intake to ensure existing water system capacity. This paper describes expected construction challenges for the new project that consists of: an intake structure and tunnel beneath the lake, pumping station, pipeline to connect existing treatment facility, and interconnecting underground adits. The project will be completed in the year 2012 for total estimated cost of approximately $600 million.
机译:内华达州南部水务局(SNWA)在位于内华达州拉斯维加斯以东20英里的米德湖经营两个取水口。自2000年以来,严重的干旱导致湖泊水位下降了85英尺,预计未来还会下降。 SNWA将建造第三条深水取水口,以确保现有的水系统容量。本文描述了新项目的预期施工挑战,该项目包括:湖下的进水口结构和隧道,泵站,连接现有处理设施的管道以及互连地下通道的管道。该项目将于2012年完成,估计总费用约为6亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号