首页> 外文期刊>Engineering news-record >Courts Demand Greater Burden of Proof in Evaluating Delay Damages
【24h】

Courts Demand Greater Burden of Proof in Evaluating Delay Damages

机译:法院要求在评估延误损害赔偿方面承担更大的举证责任

获取原文
获取原文并翻译 | 示例
           

摘要

At the American Bar Association Forum on the Construction Industry's 2013 Midwinter Meeting, construction law experts tackled the complex but critical task of proving damages incurred by contractors due to delays resulting from circumstances beyond their control. The speakers at the Midwinter Meeting plenary session on "Delay Damages-What's Hot, What's Not" pointed out that knowing who is at fault in a claim is only half the battle. The bigger question and much larger point of contention is the ability to document the amount of damage suffered.
机译:在美国律师协会建筑业2013年冬季会议上,建筑法专家解决了证明承包商因因无法控制的情况而造成的延误所造成的损害这一复杂而关键的任务。在“延迟损害赔偿-什么是热门,什么不是”上的仲冬会议全体会议上,演讲者指出,知道谁在索赔上有错只是成功的一半。更大的问题和更大的争论点是能够记录遭受的损失的数量。

著录项

  • 来源
    《Engineering news-record》 |2013年第8期|55-55|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号