首页> 外文期刊>Engineering news-record >Supporting Maintenance At the Grand Coulee Dam
【24h】

Supporting Maintenance At the Grand Coulee Dam

机译:在Grand Coulee Dam提供支持

获取原文
获取原文并翻译 | 示例
       

摘要

Originally built in the 1930s, the Grand Coulee Dam in Washington State has been undergoing a series of maintenance projects to ensure that it will continue to produce safe and reliable power into the future. One stage of the project required the heating of a 40-ft wide, 7-ft-tall outer head cover of the turbine shaft to a specific core temperature. In order to achieve this temperature, the engineers applied induction heating to one side of the workpiece. Only when the opposite side of the workpiece reached target temperature could the maintenance engineers be certain that the required core temperature had been achieved. The team from Red-D-Arc provided induction heating systems and assistance with training and setup during this essential part of the maintenance process.
机译:最初建于20世纪30年代,华盛顿州的大城岛大坝已经接受了一系列维护项目,以确保它将继续为未来生产安全可靠的权力。该项目的一个阶段需要将涡轮机轴的40英尺宽,7英尺高的外部头盖加热到特定的核心温度。为了实现这种温度,工程师将感应加热施加到工件的一侧。只有当工件的相对侧达到目标温度时,才能肯定会肯定达到所需的核心温度。来自Red-D-arc的团队提供了在维护过程的重要部分期间提供了感应加热系统和培训和设置的帮助。

著录项

  • 来源
    《Engineering news-record》 |2019年第14期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:30:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号