首页> 外文期刊>Engineering news-record >Building Better Cost Estimates
【24h】

Building Better Cost Estimates

机译:建立更好的成本估算

获取原文
获取原文并翻译 | 示例
       

摘要

The process of preparing a construction cost estimate requires pulling together a lot of information. In order to be complete, cost estimating is much more than simply the application of unit prices from historical or published cost data against quantity takeoff from a set of drawings. Rather, truly accurate estimating requires that the project is "built" through the estimate before the actual project is built in the field. The keys to pulling this off include a detailed scoping of the construction work and the use of cost data that is trustworthy and up to date. As such, an organized, measured approach to estimating is required that follows the trail of design information as it is developed and the updating of cost data as a project proceeds through the design and construction phases. Staying on top of this process helps keeps cash flow positive for those doing the estimating as well as the rest of the project team and building owner. Information gleaned from the estimates as they are performed also allows for quick shifting of resources if necessary to produce an end result that is on budget and on time.
机译:编制建筑成本估算的过程需要收集大量信息。为了完整起见,成本估算不仅仅是将历史或已发布成本数据中的单价与一组图纸中的工程数量相提并论。相反,真正准确的估算要求在实际项目在现场构建之前,通过估算“构建”项目。实现这一目标的关键包括对施工工作进行详细的范围界定,以及使用值得信赖且最新的成本数据。因此,需要一种有组织的,可衡量的估算方法,该方法应遵循设计信息的发展轨迹,并随着项目在设计和施工阶段的进行而更新成本数据。掌握此流程的顶部有助于使进行估算的人员以及项目团队其他成员和建筑物所有者的现金流保持正数。在进行估算时从估算中收集的信息还可以在必要时快速转移资源,以产生预算内和准时的最终结果。

著录项

  • 来源
    《Engineering news-record》 |2019年第3期|15-15|共1页
  • 作者

    Peter J. Arsenault;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:29:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号