首页> 外文期刊>Engineering, Construction and Architectural Management >Government support and risk-return trade-off in China's BOT power projects
【24h】

Government support and risk-return trade-off in China's BOT power projects

机译:中国BOT电力项目中的政府支持和风险回报权衡

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Government support plays an important part in risk-return trade-off of participants in privately financed infrastructure projects. Depending on the level of gov- ernment support, risk-return trade-off of the private sponsor varies from project to project. Case studies on two of China's build-operate-transfer (BOT) power projects that were developed at different time periods illustrate that government support has a significant ef- fect on both risk and return of the private sponsor. It is hoped that such understanding would help the private sponsor strike desirable risk-return trade-off in structur- ing a BOT deal.
机译:政府支持在私人融资基础设施项目参与者的风险收益权衡中起着重要作用。根据政府支持水平的不同,私人赞助商的风险回报权衡也会因项目而异。对在不同时期开发的两个中国建设-运营-转让(BOT)电力项目进行的案例研究表明,政府的支持对私人担保人的风险和回报都有重大影响。希望这种理解将有助于私人保荐人在构建BOT交易时达成理想的风险与收益权衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号