首页> 外文期刊>Renewable energy >Critical success factors for BOT electric power projects in China: Thermal power versus wind power
【24h】

Critical success factors for BOT electric power projects in China: Thermal power versus wind power

机译:中国BOT电力项目成功的关键因素:火电与风电

获取原文
获取原文并翻译 | 示例
       

摘要

Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China.
机译:中国电力行业已在许多项目中采用了建设-运营-转让(BOT)方法,以缓解国有独资的压力。中国政府付出了巨大的努力,创造了一个环境,以便利BOT方法在电力项目中的应用。此外,对可持续性问题的日益关注使传统的主要电力来源-火电项目受到了更加严格的审查。结果,各种可再生能源项目,特别是风能项目都涉及私营部门的资金。通过BOT方法进行的火电和风电项目都取得了不同程度的成功。因此,必须了解导致两种BOT电力项目成功的因素。通过广泛的文献调查,本文确定了中国BOT电力项目在5个类别下的31个成功因素。接下来是问卷调查,以检查这些因素的相对重要性。结果表明,BOT火力发电项目与风能发电项目成功因素的重要性程度不同。最后,对调查结果进行分析,以探索确定的成功因素之间的潜在构造和分布。该研究为所有有兴趣在中国发展BOT电力项目的相关方提供了宝贵的参考。

著录项

  • 来源
    《Renewable energy》 |2010年第6期|1283-1291|共9页
  • 作者单位

    School of Business Administration, North China Electric Power University, Beijing 102206, China;

    School of Natural and Built Environments, University of South Australia, Adelaide 5001, Australia;

    School of Natural and Built Environments, University of South Australia, Adelaide 5001, Australia;

    Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118, China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    BOT; critical success factors; China; thermal power project; wind power project;

    机译:BOT;成功的关键因素;中国;火电项目;风力发电项目;
  • 入库时间 2022-08-18 00:26:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号