首页> 外文期刊>Earthquake Engineering & Structural Dynamics >Probability-based seismic reliability assessment method for substation systems
【24h】

Probability-based seismic reliability assessment method for substation systems

机译:基于概率的变电站系统地震可靠性评估方法

获取原文
获取原文并翻译 | 示例

摘要

Power systems play a key role in emergency rescue after an earthquake. Substations are among the most important components of a power system, so it is necessary to study their seismic reliability after an earthquake. Most studies, however, have focused on the seismic behavior of major electrical equipment or the reliability of the substation under ordinary operational conditions. The seismic reliability of substations as a system has not been thoroughly studied. This study proposes a new probability-based method to evaluate the seismic reliability of complex engineering systems such as substations. The proposed method developed the state tree to construct a greatly simplified system model that enables the failure probability to be calculated for the whole system, with explicit consideration of correlations among various components. A typical 220/110/10-kV substation was studied with this method, and the most critical components were identified.
机译:电力系统在地震发生后的紧急救援中起着关键作用。变电站是电力系统中最重要的组成部分,因此有必要研究地震后的地震可靠性。但是,大多数研究都集中在常规运行条件下主要电气设备的抗震性能或变电站的可靠性上。变电站作为一个系统的抗震可靠性尚未得到充分研究。这项研究提出了一种新的基于概率的方法来评估诸如变电站等复杂工程系统的地震可靠性。所提出的方法开发了状态树,以构建一个大大简化的系统模型,该模型能够在不考虑各个组件之间的相关性的情况下,为整个系统计算出故障概率。用这种方法研究了一个典型的220/110 / 10-kV变电站,并确定了最关键的组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号