首页> 外文期刊>Dredging and Port Construction >CWind Taiwan completes Yunlin survey
【24h】

CWind Taiwan completes Yunlin survey

机译:台湾CWind完成云林调查

获取原文
获取原文并翻译 | 示例
           

摘要

A bathymetric survey has been carried out in the Taiwan Strait in preparation for the construction of an offshore wind farm.The month-long project was completed in October 2018, in a site where German wind farm developer wpd offshore will start constructing a wind farm in 2020.The bathymetric survey was conducted by CWind Taiwan, a joint venture between UK wind farm service provider CWind and Taiwanese survey and crew transfer vessel service provider International Ocean Vessel Technical Consultant (IOVTEC).President Tsai Ing-wen's government is pushing a green energy policy that has precipitated the building of offshore wind farms across Taiwan.
机译:在台湾海峡进行了测深调查,以准备建设海上风电场.2018年10月,为期一个月的项目完成,德国风电场开发商wpd Offshore将在该地点开始在台湾建设风电场。 2020年,由英国风力发电场服务提供商CWind与台湾测量和乘员转船服务提供商国际远洋船舶技术顾问(IOVTEC)合资成立的台湾CWind台湾公司进行了水深测量。促使台湾各地建立海上风电场的政策。

著录项

  • 来源
    《Dredging and Port Construction》 |2019年第599期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号