...
首页> 外文期刊>JFE 技報 >新中間粗圧延機導入によるハット形鋼矢板製造対応
【24h】

新中間粗圧延機導入によるハット形鋼矢板製造対応

机译:通过引入新的中间粗轧机帽形钢板制造响应

获取原文

摘要

At JFE Steel West Japan Works (Kurashiki District) Shapes Plant, 900 mm wide hat shaped steel sheet pile was started production in 2007 as a next-generation steel sheet pile with excellent workability, structural reliability, and economy compared to the U shaped steel sheet pile that has been used conventionally. As the spread of hat shaped steel sheet piles progressed, JFE Steel decided to renew the intermediate rough rolling mill to meet the increasing demand, and the construction was completed in February 2018. In this paper, the outline of the new rolling mill and the contents of the corresponding work are introduced.
机译:在JFE Steel West Japan Works(Kurashiki区)塑造厂,900毫米宽帽形钢板桩于2007年开始生产,作为下一代钢板桩,与U形钢板相比具有出色的可加工性,结构可靠性和经济性 通常使用的堆。 随着帽子形钢板桩的涂抹进展,JFE钢决定更新中间粗轧机以满足日益增长的需求,建设于2018年2月完成。本文在本文中完成了新的轧机和内容的轮廓 介绍了相应的工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号