...
首页> 外文期刊>Journal of Zhejiang University. Science, A >Complete fuzzy scheduling and fuzzy earned value management in construction projects
【24h】

Complete fuzzy scheduling and fuzzy earned value management in construction projects

机译:建筑项目中完全模糊调度和模糊赚取的价值管理

获取原文
           

摘要

This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value. It goes a step further than the existing literature: in the formulation of the fuzzy earned value we consider not only its duration, but also cost and production, and alternatives in the scheduling between the earliest and latest times. The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers. Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology. The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut, adapting it to the specific circumstances of the project.
机译:本文旨在通过应用模糊赚取的价值提出项目调度和控制的全面提案。它进一步比现有文献更进一步:在制定模糊赚取的价值中,我们不仅考虑其持续时间,而且在最早和最近时间之间的成本和生产以及调度中的替代方案。数学模型在原型结构项目中实现,所有估计值都被视为模糊数。我们的研究结果表明,不同的可能的时间表和模糊算术在不确定的环境中提供比传统方法更多的目标。所提出的模型允许通过调整α-切割来控制环境的模糊性,使其适应项目的具体情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号