Stone and concrete revetments are widely constructed to control bank erosion and thus stabilize river banks. The consequences include accelerated erosion at unrevetted downstream channel sections and in-channel incision at revetted sections. The studied section of the Tisza River (Hungary) was revetted along 49% of its banks in the 20th century with stepped-block and placed-rock revetments. We therefore aimed (1) to study the effects of revetment constructions on channel processes and (2) to evaluate the state and collapse of revetments using a DEM of the channel and ADCP measurements. In the late 19th century, the river had an equilibrium meandering channel, with alternating eroding and aggrading banks. Currently, erosional processes dominate. Thus, 65% of the total channel length is affected by bank erosion. The revetments reduced the active lateral erosional processes only temporarily, as 58% of the revetments, mainly placed-rock, are already damaged. The flow characteristics at the revetted sections were found to depend on the rate and type of revetment collapse. Large pools developed in front of the revetments, playing an important role in initiating their erosion. The placed-rock revetments can collapse by slides or by stones falling into the pool one-by-one. In this case, a knickpoint develops, propagating upstream. Thus, the collapse and accelerated bank erosion also propagate upstream. The increased hazard created by the failure of the revetments requires the re-planning of bank stabilization practices.
机译:石材和混凝土的护垫被广泛构建,以控制银行侵蚀,从而稳定河岸。后果包括在未缺陷的下游通道部分和接待部分的渠道内切口处加速侵蚀。 Tisza River(匈牙利)的研究区沿着20世纪的49%的银行培训,陷入困境和岩石的破坏。因此,我们针对(1)研究了护岸结构对渠道流程的影响和(2)使用频道和ADCP测量的DEM评估了修道的状态和崩溃。在19世纪后期,河流有一个均衡的蜿蜒频道,交替腐蚀和加重的银行。目前,侵蚀过程占主导地位。因此,总渠道长度的65%受到银行侵蚀的影响。修道院仅暂时减少了活跃的横向侵蚀过程,占58%的修道,主要是放置的岩石,已经损坏。发现已接待部分的流动特性取决于护垫崩溃的速率和类型。在修道院前开发的大型游泳池,在启动他们的侵蚀方面发挥着重要作用。放置的岩石修饰可以通过幻灯片或逐渐落入游泳池的石头坍塌。在这种情况下,knickpoint开发,在上游传播。因此,崩溃和加速的银行侵蚀也在上游传播。由于破坏者失败创造的危险需要重新规划银行稳定实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号