首页> 外文期刊>Procedia Manufacturing >Machining Operations for Components in Kitchen Furniture: A Comparison Between Two Management Systems
【24h】

Machining Operations for Components in Kitchen Furniture: A Comparison Between Two Management Systems

机译:厨房家具组件的加工操作:两个管理系统之间的比较

获取原文
           

摘要

A comparison between two machining of pieces management systems for the manufacture of kitchen furniture is presented. These pieces are characterized by having a morphology based on cuboid shapes and therefore defined by three variables: height, width and thickness. The first management system (type A) is based on the total machining of the pieces in a single process that uses boards of different raw materials (agglomerate, plywood, MDF, etc.). This is done in a single work center cutting the pieces as well as most of the holes necessary for the final assembly and the placement of hinges, handles and other fittings depending on the type of module. In the second system (type B) the process is done in two stages: the cutting of the pieces in the work center described above and the final finish prior to assembly in another work center. This investigation delves into a fundamental part of the process analyzed in a previous investigation in a Galician kitchen furniture manufacturing company. The goal is to demonstrate that the two stages system is the most suitable for a manufacturing characterized by a low standardization and the ability to meet orders with special modules with a customized manufacturing and therefore for the current production system in that company. The main results show that the second system is better: the total machining time used is 38% lower and the development time of machining programs for special parts (non-standard) is reduced to one third in type B system. As a main conclusion in this specific case, it is highlighted that the separation of cutting and machining operations improve productivity and flexibility especially in regard to setup times.
机译:介绍了两种加工厂家家具生产系统的比较。这些作品的特征在于基于长方体形状具有形态,因此由三个变量限定:高度,宽度和厚度。第一管理系统(A型)基于单个过程中的块的总加工,该过程使用不同原料(附聚,胶合板,MDF等)的电路板。这是在单个工作中心完成切割作品以及最终组装所需的大部分孔,以及根据模块的类型的铰链,手柄和其他配件的放置。在第二系统(B型)中,该过程在两个阶段完成:在另一个工作中心组装之前的工作中心中的切割和最终完成。本调查涉及在加利西亚厨房家具制造公司之前调查的过程中的基本部分。目标是证明这两个阶段系统最适合制造具有低标准化的制造,以及能够与特殊模块满足具有定制制造的特殊模块的能力,从而实现该公司的当前生产系统。主要结果表明,第二个系统更好:所使用的总加工时间为38%,特殊部件(非标准)的加工程序的开发时间降至B型中的三分之一。作为本具体情况的主要结论,突出显示切割和加工操作的分离,提高生产率和灵活性,特别是在设置时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号