首页> 外文期刊>Oil & Gas Research >Optimum Pattern and Rate Injection Determination of Waterflooding Project (Case Study in Block ' A' on 'DS' Field)
【24h】

Optimum Pattern and Rate Injection Determination of Waterflooding Project (Case Study in Block ' A' on 'DS' Field)

机译:水性项目的最佳模式和速率注射测定(“DS”场块“A”的案例研究)

获取原文
           

摘要

“DS” field is one of the mature field located in Block “A” which has been produced since 1975. The remaining reserves of this field is 14,285 MSTB with remaining recovery factor 25.04%. The Water Oil Contact is up-leveling during the production phase where in current condition, this field has high water cut which means high water production. While the remaining reserves is still big enough to produce and the field produces a lot of water, field development with waterflooding method may be applied. Analysis of development scenarios using ECLIPSE 2010.1 reservoir simulation software. The parameter considered is the pattern and rate of injection. Base case is a scenario that simulates the field from history matching condition until August 2032. Scenario 2 with peripheral injection pattern and the 9 scenarios of injection rate. Scenario 3 with regular injection patterns 5 and 6 spots injection rate scenario. Scenario 4 with regular injection patterns 4 spot and 6 injection rate scenario. From engineering analysis, the best scenario is Scenario 2 with 10 peripheral injection wells but from economic analysis, the best fit scenario is Scenario 3 with 8 5-spot injection wells.
机译:“DS”字段是位于“A”块中的成熟字段之一,该字段是自1975年以来生产的。该字段的其余储备为14,285 MSTB,剩余恢复因子25.04%。水上油接触在生产阶段升级,在当前条件下,该领域具有高水位,这意味着高水产。虽然剩余的储备仍然足够大,但该领域产生大量的水,可以应用利用水上飞机方法的田间开发。 Eclipse 2010.1储库仿真软件的开发方案分析。所考虑的参数是注射的图案和速率。基本情况是一种情况,它从历史匹配条件模拟历史匹配条件,直到8月2032。情景2,外围注射图案和注射速率的9场景。方案3具有常规注射图案5和6点注射速率场景。方案4具有常规注射模式4点和6个注射率方案。从工程分析中,最佳情景是一个场景2,具有10个外围注射井,但来自经济分析,最好的拟合场景是情景3,具有8个5个点注射井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号