首页> 外文期刊>Engineering journal >Proposing an Optimum Model for Time Estimation of Construction Projects in Iranian Gas Refineries
【24h】

Proposing an Optimum Model for Time Estimation of Construction Projects in Iranian Gas Refineries

机译:提出伊朗气体炼油厂建设项目时间估算的最佳模型

获取原文

摘要

Time management can be effective in a project when the project schedule is based on comprehensive time scheduling. In the industries with complicated processes, many uncertainties and risks affect the timing of projects. Considering the very low reliability of the project planning in certainty-based approach, using more secure models for control and interact with uncertainty should be placed on the agenda. Iranian Gas Company has been using risk management to manage probable uncertainties in construction projects but in the field of possible uncertainties, actions are very scarce. This article aims to propose an optimum model based on the integrated risk management and fuzzy expert systems in order to provide comprehensive project time estimation and in this regard, reviews the results of the implementation of this model in construction projects of Iranian gas refineries. The results show that the proposed model increases the accuracy of time estimation about 8 to 24 percent.
机译:当项目计划基于全面时间调度时,时间管理在项目中可以有效。在具有复杂过程的行业中,许多不确定性和风险会影响项目的时机。考虑到基于确定的方法的项目规划的可靠性,使用更安全的控制模型,应当放在议程上。伊朗天然气公司一直在利用风险管理来管理建筑项目中可能的不确定性,但在可能的不确定性领域,行动非常稀缺。本文旨在提出基于综合风险管理和模糊专家系统的最佳模型,以便提供全面的项目时间估计,并在这方面提供了伊朗天然气炼油厂建设项目的实施结果。结果表明,该模型提高了约8至24%的时间估计的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号