首页> 外文期刊>Engineering Technology and Applied Science Research >Application of Fuzzy Expert Systems to Manage the Projects Time in Iranian Gas Refineries
【24h】

Application of Fuzzy Expert Systems to Manage the Projects Time in Iranian Gas Refineries

机译:模糊专家系统在伊朗天然气精炼厂项目时间管理中的应用

获取原文
           

摘要

The National Iranian Gas Company (NIGC) is one of the top ten gas companies in the gas industry in the Middle East and is comprised of 7 gas refineries. So this company needs to apply the most optimum time management methods to achieve its goals. Custom scheduling calculation of project planning uses the Critical Path Method (CPM) as a tool for Planning Projects activities. CPM is now widely used in planning and managing projects but in spite of its wide application, this method has a critical weak point of not taking into account the uncertainties in scheduling calculation. This article aims to present a precise method based on the application of Fuzzy Expert Systems in order to improve the Time Estimation Method in construction projects and in this regard, reviews the results of the implementation of this method in construction projects of Iranian Gas Refineries. The results show that the proposed method increases the accuracy of time estimation about 7 to 22 percent.
机译:伊朗国家天然气公司(NIGC)是中东天然气行业十大天然气公司之一,由7家天然气精炼厂组成。因此,该公司需要采用最佳的时间管理方法来实现其目标。项目计划的自定义计划进度计算使用关键路径法(CPM)作为计划项目活动的工具。 CPM现在被广泛用于计划和管理项目,但是,尽管CPM的广泛应用,但它的一个关键弱点是没有考虑调度计算中的不确定性。本文旨在提出一种基于模糊专家系统的精确方法,以改进建筑项目中的时间估算方法,并在此方面,回顾该方法在伊朗天然气精炼厂建筑项目中的实施结果。结果表明,该方法将时间估计的准确度提高了约7-22%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号