首页> 外文期刊>Procedia - Social and Behavioral Sciences >Selection of Equipment for Construction of a Hilly Road Using Multi Criteria Approach
【24h】

Selection of Equipment for Construction of a Hilly Road Using Multi Criteria Approach

机译:基于多准则方法的丘陵公路施工设备选择

获取原文
           

摘要

Planning and construction of a road in hilly region is very challenging which involves complex processes such as reconnaissance and survey to fix the alignment, formation work and construction of various layers of pavement. It has always been a daunting task for implementing agencies to select proper equipments effectively during construction of a road by taking into consideration of both tangible and intangible factors so as to maximize the benefits of the limited resources. An application of five multi-criteria decision making (MCDM) techniques to a typical selection of equipments used for hilly road construction is presented. Three criteria representing earthwork operations, operational efficiency and convenience of manager have been considered with six sub criteria each for selection of seven different construction equipment alternatives. Five MCDM techniques: Analytical Hierarchy Process (AHP), Simple Additive Weights Method (SAW), Distance Based Method (DBM), Preference Ranking Organization Method (PROMETHEE) and Elimination Et Choice Translating Reality (ELECTRE) methods are examined as potential decision-aid tools to select the appropriate management scheme. Comparison of the results shows that these quite different MCDM techniques lead to a similar subset of recommended solutions. Finally, a case study of Katra-Reasi road of 26 Km length has been carried out to evaluate correct equipments/machinery used for construction of the road hereby optimizing the output. The study clearly demonstrates that alternative dozer D80 is the best choice among the alternatives which has maximum output of 48 cum/hr.
机译:丘陵地区道路的规划和建设非常具有挑战性,涉及复杂的过程,例如侦察和勘测,以固定路线,平整工作和铺筑各层路面。对于执行机构来说,始终要兼顾有形和无形因素,以在有限的条件下有效地选择合适的设备,从而最大限度地利用有限的资源,这一直是一项艰巨的任务。介绍了五种多标准决策(MCDM)技术在丘陵公路施工设备典型选择中的应用。考虑了代表土方作业,运营效率和管理者便利性的三个标准,每个子标准有六个子标准,用于选择七个不同的建筑设备替代方案。将五种MCDM技术作为潜在的决策辅助手段进行了研究:分析层次过程(AHP),简单加法权重方法(SAW),基于距离的方法(DBM),偏好排序组织方法(PROMETHEE)和消除等选择转换现实(ELECTRE)方法选择适当管理方案的工具。结果比较表明,这些完全不同的MCDM技术可导致推荐解决方案的相似子集。最后,对26公里长的Katra-Reasi道路进行了案例研究,以评估用于道路建设的正确设备/机器,从而优化输出。研究清楚地表明,替代推土机D80是最大输出量为48 cum / hr的替代品中的最佳选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号