Modeling the Impact of Anchoring in Capacity Adjustments to Work-In-Process Behavior in a Two Stage Production System: A System Dynamics Approach

机译:在两阶段生产系统中建模产能调整中的锚定对在制品行为的影响:系统动力学方法

获取原文
           

摘要

Past researches have focused on managing Work-In-Process (WIP) through the use of WIP control policies such as Kanban, CONWIP, and DBR. These WIP policies assume that decision makers are rational and are able to follow the optimality conditions stated by these policies. Behavioral Operations Management suggests that decision makers are not “rational” decision makers and possess limited or bounded rationality [1]. One particular behavioral element among decision makers that is related to bounded rationality is the use of “anchoring” in decision making.This paper focuses on exploring the impact of changes in anchoring for a two-stage production system by an upstream decision maker who is responsible for capacity adjustments in order to maintain flow of products. The decision maker is theorized to adapt anchoring and adjustment based on the amount of work in process in the production system. Three anchors are tested, namely, a.) Anchoring on output, b.) Anchoring on input, and c.) No anchors.Using system dynamics approach, initial finding from the simulation suggest that WIP variability increases when changes in anchoring for capacity adjustment is based on downstream information rather than upstream. However, when anchors are taken out as an option for capacity adjustments, the WIP variability achieves a more stable pattern.
机译:过去的研究集中在通过使用WIP控制策略(例如看板,CONWIP和DBR)来管理在制品(WIP)。这些在制品政策假定决策者是理性的,并且能够遵循这些政策规定的最优条件。行为运营管理认为,决策者不是“理性的”决策者,他们具有有限或有限的理性[1]。决策者中与有限理性有关的一个特殊行为要素是在决策过程中使用“锚定”。本文着重探讨上游决策者在负责两阶段生产系统的锚定变化时所产生的影响。进行容量调整以保持产品流向。理论上,决策者可以根据生产系统中正在进行的工作量来调整锚定和调整。测试了三个锚点,即a。在输出端锚定b。在输入端锚定c。没有锚定。使用系统动力学方法,从模拟中初步发现,在更改锚点以进行容量调整时,WIP可变性会增加基于下游信息而不是上游信息。但是,将锚点作为容量调整的选项时,WIP可变性将获得更稳定的模式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号