首页> 外文期刊>International Journal of Engineering Research and Applications >Investigation of Causes of Delay in High Rise Building Project and Remedial Measures Case Study-Pune
【24h】

Investigation of Causes of Delay in High Rise Building Project and Remedial Measures Case Study-Pune

机译:高层建筑项目延误的原因调查及补救措施案例研究-浦那

获取原文
           

摘要

At present, the approval processes involved in construction projects is complex all over country While undertaking construction projects like residential, commercial or industrial etc., it has been observed that obtaining clearances for the Building Projects has become cumbersome and lengthy. Over the past decade it has been observing that huge population enters into big cities like Pune for bread and butter, so there is tremendous demand for housing. This demand is fulfilled by developer, builder. But due to less availability of land, vertical construction is most demanding in the form of high rise buildings......
机译:目前,全国各地建筑项目的审批程序很复杂。在进行住宅,商业或工业等建筑项目时,已经发现获得建筑项目的许可变得既麻烦又冗长。在过去的十年中,一直观察到大量人口涌入像浦那这样的大城市来获取面包和黄油,因此对住房的需求巨大。开发商,建筑商满足了这一需求。但是由于可用土地较少,垂直建筑对高层建筑的要求最高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号