首页> 外文期刊>IFAC PapersOnLine >Lot Size Dependence for Energy Consumption per Unit of Production Throughput Considering Rush Orders in Manufacturing Lines
【24h】

Lot Size Dependence for Energy Consumption per Unit of Production Throughput Considering Rush Orders in Manufacturing Lines

机译:考虑生产线紧急订单的每生产能力能耗的批量大小相关性

获取原文
           

摘要

In an effort to further reduce energy consumption per unit, many studies have, in recent years, been conducted to formulate the relation between energy consumption per unit and lot size along the manufacturing line. Yet, little effort has been directed toward production management and management methods that optimize energy consumption per unit while considering frequent rush orders in the manufacturing system. In this study, we theoretically formulate a relation between lot size and energy consumption per unit that considers rush orders in the manufacturing line.
机译:为了进一步降低单位能耗,近年来,进行了许多研究,以沿着生产线制定单位能耗与批量大小之间的关系。然而,在考虑制造系统中频繁的紧急订单的同时,很少有精力致力于生产管理和优化单位能耗的管理方法。在这项研究中,我们从理论上公式化了考虑生产线中的紧急订单的批量大小与单位能耗之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号