首页> 外文期刊>IFAC PapersOnLine >Synchronization Options in the Transmission System in Case of the Reconfiguration
【24h】

Synchronization Options in the Transmission System in Case of the Reconfiguration

机译:重新配置时传输系统中的同步选项

获取原文

摘要

Abstract: The purpose of reconfiguration in the power system of Slovak Republic is to decrease the power flow of the critical elements in the system. Therefore, in practice, the effect of the reconfiguration on the power loading of the individual elements in the system is monitored. On the other hand, less attention is paid to some additional negative impacts on the system, which may cause more problems in unexpected emergency conditions. Secondary, the non-fulfilment security criterion N-1 on other elements or limitation of the synchronization possibilities and restoration of basic grid topology are in terms of dispatch control the most critical. The article presents the problem of restoration of the basic grid topology during the violation of the synchronization conditions. The problem was measured by WAMS during the real-time operation in case of reconfiguration in 400 kV substation Leme?any and Varín during switching in the field of combined busbar coupler.
机译:摘要:斯洛伐克共和国电力系统的重新配置目的是减少系统中关键元素的电力流。因此,实际上,监视了重新配置对系统中各个元件的功率负载的影响。另一方面,对系统的一些其他负面影响的关注较少,这可能会在意外的紧急情况下引起更多问题。其次,就调度控制而言,其他要素的非实现安全标准N-1或同步可能性的限制以及基本网格拓扑的恢复是最关键的。本文提出了在违反同步条件的情况下恢复基本网格拓扑的问题。在组合母线耦合器领域进行切换期间,如果在400 kV变电站Leme?any和Varín中进行了重新配置,则在实时运行期间通过WAMS测量了该问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号