...
首页> 外文期刊>IFAC PapersOnLine >ANSI/ISA 95 FINAL CAPACITY SCHEDULING FOR SOFTWARE INDUSTRY
【24h】

ANSI/ISA 95 FINAL CAPACITY SCHEDULING FOR SOFTWARE INDUSTRY

机译:ANSI / ISA 95软件行业的最终容量计划

获取原文

摘要

The Scheduling in Software Industry is a matter that caused many studies and various approaches for solving this problem in the past few decades. Neither of these approaches uses as a framework the industrial standard ANSI/ISA 95 in which the models for Capability, Scheduling and Execution are tightly connected with the needed Resources and their availability. In this research the matter of Final Capacity Scheduling using the standard ANSI/ISA 95 as a framework is discussed. Examples are given for using ISO 22400 Key Performance Indicators in the calculation of some important for the Scheduling process parameters.
机译:在过去的几十年中,软件行业的调度问题引起了许多研究和各种方法来解决此问题。这些方法均未使用工业标准ANSI / ISA 95作为框架,在该标准中,能力,计划和执行模型与所需资源及其可用性紧密相关。在这项研究中,讨论了使用标准ANSI / ISA 95作为框架的最终容量调度问题。给出了使用ISO 22400关键绩效指标来计算一些重要的计划过程参数的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号