首页> 外文期刊>Journal of advanced transportation >Multia??objective analysis of using Ua??turns as alternatives to direct left turns at twoa??way stopa??controlled intersections
【24h】

Multia??objective analysis of using Ua??turns as alternatives to direct left turns at twoa??way stopa??controlled intersections

机译:使用Ua?转弯作为替代方法在双向“ a stopa”控制交叉口处左转的多目标分析

获取原文
       

摘要

This study aims to propose a method to conduct multia??objective analysis of traffic treatments by taking into consideration multiple external impacts. To illustrate the procedure, the economic benefit of converting a twoa??way stopa??controlled (TWSC) intersection to a right turn followed by Ua??turn (RTUT) intersection was calculated, considering not only the safety impacts but also the operational and environmental impacts. First, vissim simulation models were developed to obtain the total travel time, vehicle emissions, and fuel consumption for the intersection both before and after the treatment. The operational impact was calculated as the travel time saving benefits. The environmental impact was calculated as the reduction in vehicle emissions and fuel consumption costs. The safety impact was estimated as the crash reduction benefits for the RTUT treatment using safety performance functions and crash modification factors (CMFs). CMFs were estimated using metaa??analysis methods. Finally, the lifea??cycle cost method was used to combine different components in the total benefit. The Monte Carlo simulation method was used to conduct uncertainty analysis by using random sampling from probability descriptions of uncertain input variables to generate a probabilistic description of results. The findings showed that, first, the benefits with the use of RTUT treatment can be countervailing even for a single objective. Second, the net present value associated with the RTUT treatment increased with an increase in the proportion of lefta??turn traffic from the major street when the percentage of lefta??turn traffic from the major street was from 0% to 22% and became stable after that. The study illustrates the detailed process of evaluating projects considering multiple objectives. This process offers policy and decision makers a solid and practical reference using existing guidebooks and software. The findings also provide suggestions about the suitable condition to install RTUT treatments at TWSC intersections. Copyright ?? 2015 John Wiley & Sons, Ltd.
机译:这项研究旨在提出一种方法,通过考虑多种外部影响进行交通处理的多目标分析。为了说明该程序,计算了双向双向停车控制(TWSC)交叉路口向右转弯然后由Ua ??转弯(RTUT)相交路口的经济效益,不仅考虑了安全影响,而且考虑了运营和环境影响。首先,开发了vissim仿真模型,以获取治疗前后交叉路口的总行驶时间,车辆排放和燃料消耗。运营影响计算为节省旅行时间的收益。对环境的影响计算为减少的车辆排放和燃料消耗成本。使用安全性能功能和碰撞修正因子(CMF),将安全影响评估为RTUT处理减少碰撞的好处。使用荟萃分析法估计CMF。最后,生命周期成本法用于组合总收益中的不同组成部分。蒙特卡罗模拟方法用于对不确定性输入变量的概率描述进行随机抽样,从而对结果进行概率描述,从而进行不确定性分析。研究结果表明,首先,即使对于单个目标,使用RTUT治疗的益处也可能抵消。第二,当主要街道的左转弯流量的百分比从0%变为22%时,与RTUT处理相关的净现值随着主要街道的左转弯流量的比例的增加而增加。之后保持稳定。该研究说明了考虑多个目标的项目评估的详细过程。此过程可为政策和决策者提供使用现有指南和软件的扎实实用参考。调查结果还提供了有关在TWSC交叉口安装RTUT处理的合适条件的建议。版权?? 2015年John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号