首页> 外文期刊>Proceedings of the International Association of Hydrological Sciences >Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method
【24h】

Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

机译:基于改进GA-POA方法的梯级水电站中长期优化调度

获取原文
           

摘要

In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of cascade hydro-power stations in large river basins. The typical annual runoff data are selected to calculate the difference between the calculated results under different representative years. The results show that the cascade operation of cascaded hydro-power stations can significantly increase the overall power generation of cascade and ease the flood risk caused by concentration of flood season.
机译:为了探索级联组合发电的效率和合理性,建立了具有最大发电量的级联组合最优模型,并通过改进的GA-POA方法对模型进行求解。它为大河流域梯级水电站联合开发提供了有益的参考。选择典型的年度径流数据来计算不同代表年份下计算结果之间的差异。结果表明,梯级水电站的梯级运行可以显着增加梯级的总发电量,减轻因汛期集中而引起的洪水风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号