首页> 外国专利> POWER SYSTEM RELIABILITY ASSESSMENT METHOD CONSIDERING OPTIMIZED SCHEDULING OF CASCADE HYDROPOWER STATIONS

POWER SYSTEM RELIABILITY ASSESSMENT METHOD CONSIDERING OPTIMIZED SCHEDULING OF CASCADE HYDROPOWER STATIONS

机译:考虑级联水电站优化调度的电力系统可靠性评估方法

摘要

The present invention discloses a power system reliability assessment method considering optimized scheduling of cascade hydropower stations, by which the reliability of the power system is improved, comprising following steps: establishing power system optimization models; inputting the sequential wind speed, runoff and load data within 24h; in accordance with reliability parameters of units and by the sequential Monte Carlo method, sampling the state durations of three kinds of units and segmenting the state durations on a 24-hour cycle; calculating the sequential output of wind farms within 24h according to wind speed data and the state of wind power units; calculating the hourly loss-of-load, according to the state of wind power units and thermal power units as well as the optimization models; optimizing for 365 days according to the method described in the step 4, and calculating reliability indices; and determining convergence or not, and if not, continuously repeating the steps S3 to S7 until convergence.
机译:本发明公开了一种考虑级联水电站优化调度的动力系统可靠性评估方法,通过该优化调度,改善了电力系统的可靠性,包括以下步骤:建立电力系统优化模型;在24小时内输入顺序风速,径流和负载数据;按照单位的可靠性参数和顺序蒙特卡罗方法,采样三种单位的状态持续时间并在24小时周期上分割状态持续时间;根据风速数据和风电机状态计算24小时内风电场的顺序输出;根据风电机和火电机的状态以及优化模型,计算每小时的负载损失;根据步骤4中描述的方法和计算可靠性指标优化365天;并确定收敛,如果没有,则不会连续地重复步骤S3至S7直到收敛。

著录项

  • 公开/公告号US2021064798A1

    专利类型

  • 公开/公告日2021-03-04

    原文格式PDF

  • 申请/专利权人 CHONGQING UNIVERSITY;

    申请/专利号US202016987258

  • 申请日2020-08-06

  • 分类号G06F30/20;G06Q10/04;G06Q10/06;G06Q50/06;G06N20;G06N7;

  • 国家 US

  • 入库时间 2022-08-24 17:29:55

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号