首页> 中文期刊>水科学与水工程 >Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm

Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm

     

摘要

Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.

著录项

  • 来源
    《水科学与水工程》|2012年第1期|46-58|共13页
  • 作者单位

    Beijing Key Laboratory of New and Renewable Energy, North China Electric Power University,Beijing 102206, P.R.China;

    Beijing Key Laboratory of New and Renewable Energy, North China Electric Power University,Beijing 102206, P.R.China;

    Hydrochina Kunming Engineering Corporation, Kunming 650051, P.R.China;

    Jinsha River Hydropower Development Co., Ltd., Kunming 650228, P.R.China;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

  • 入库时间 2023-07-26 01:35:56

相似文献

  • 中文文献
  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号