首页> 外文期刊>Journal of Water Resources Planning and Management >Optimized Scheduling of Cascade Pumping Stations in Open-Channel Water Transfer Systems Based on Station Skipping
【24h】

Optimized Scheduling of Cascade Pumping Stations in Open-Channel Water Transfer Systems Based on Station Skipping

机译:基于站跳跃的开放式水转印系统级联泵站优化调度

获取原文
获取原文并翻译 | 示例
           

摘要

Cascade pumping stations (CPSs) in open-channel water transfer systems usually consume vast amounts of energy and are expensive to operate. For these CPS systems, scheduling optimization is a critical approach to save energy. In this paper, an optimized scheduling method based on station skipping is proposed, in which the use of one or more pumping stations can be reduced and the allocation of the gross head to other stations is optimized. In this method, a one-dimensional hydrodynamic model and a complex optimization model were established. The Miyun Reservoir Regulation and Storage Project in Beijing was selected for a case study. The results indicate that (1) some stations with low heads could be skipped at low or medium discharges compared with the design discharge; and (2) the optimization scheme with skipping pumping stations has a more substantial energy-saving effect than that without skipping any stations under certain conditions. This proposed method makes it possible to save energy and reduce cost at low or medium required discharges in such CPS systems.
机译:开放式水转印系统中的级联泵站(CPSS)通常消耗大量的能量,并且运行昂贵。对于这些CPS系统,调度优化是节省能源的批判方法。在本文中,提出了一种基于站跳跃的优化调度方法,其中可以减少使用一个或多个泵站,并且优化了总粗略到其他站的总体。在该方法中,建立了一维流体动力模型和复杂优化模型。选择北京的Miyun水库监管和储存项目进行案例研究。结果表明(1)与设计放电相比,可以在低或中排放的情况下跳过一些具有低头的站; (2)具有跳过泵站的优化方案具有比某些条件下的任何站点的更大的节能效果。该提出的方法使得可以节省能量并降低在这种CPS系统中的低或中等所需放电的成本。

著录项

  • 来源
    《Journal of Water Resources Planning and Management》 |2019年第7期|05019011.1-05019011.12|共12页
  • 作者单位

    Hohai Univ State Key Lab Hydrol Water Resources & Hydraul En Coll Water Conservancy & Hydropower Engn Nanjing 210098 Jiangsu Peoples R China;

    China Inst Water Resources & Hydropower Res State Key Lab Simulat & Regulat Water Cycle River Beijing 100038 Peoples R China;

    China Inst Water Resources & Hydropower Res State Key Lab Simulat & Regulat Water Cycle River Beijing 100038 Peoples R China;

    Hohai Univ State Key Lab Hydrol Water Resources & Hydraul En Coll Water Conservancy & Hydropower Engn Nanjing 210098 Jiangsu Peoples R China;

    China Inst Water Resources & Hydropower Res State Key Lab Simulat & Regulat Water Cycle River Beijing 100038 Peoples R China;

    Hohai Univ State Key Lab Hydrol Water Resources & Hydraul En Coll Water Conservancy & Hydropower Engn Nanjing 210098 Jiangsu Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Optimized scheduling; Cascade pumping stations; Station skipping; Energy cost; Energy consumption;

    机译:优化调度;级联泵站;驻车跳闸;能源成本;能源消耗;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号