...
首页> 外文期刊>PCI journal >Record Span Spliced Bulb-Tee Girders Used Highland View Bridge
【24h】

Record Span Spliced Bulb-Tee Girders Used Highland View Bridge

机译:记录跨度的拼接灯泡形T形大梁二手高地观桥

获取原文
   

获取外文期刊封面封底 >>

       

摘要

align="left">At 250 ft (76.2 m), the main span of Highland View Bridge - a 2600 ft (793 m) long precast, prestressed concrete structure on U.S. 98 over the Gulf Intracoastal Waterway in Florida - is the longest? concrete girder span ever constructed in the United States. This record span was achieved with the use of continuous precast post-tensioned concrete bulb-tee girders combined with a spliced drop-in girder. This? article discusses the competitive bidding, design considerations, production and construction operations, and erected cost of the bridge. With this experience, it is expected that even longer span precast,? prestressed concrete bridges will be constructed in the near future.
机译:align =“ left”>在250英尺(76.2 m)处,高地景观桥的主要跨度是佛罗里达州墨西哥湾沿岸水道上US 98上长2600英尺(793 m)的预制预应力混凝土结构。最长?在美国建造的混凝土箱梁跨度。通过使用连续预制的后张预应力混凝土球型T形梁与拼接的下沉式梁相结合,实现了这一记录跨度。这个?本文讨论了桥梁的竞争性招标,设计考虑,生产和建设运营以及架设成本。凭此经验,可以预期甚至更长的预制时间?预应力混凝土桥梁将在不久的将来建造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号